Scaffoldings
THE FRONT ( saddle) scaffoldings

Front ( saddle) scaffoldings are intended for performance the construction and finishing operations . The rigid frame and reliable connection units allow to mount the quickly, providing high stability of scaffoldings "grid".

Using additional elements (consoles, etc.) it is possible to change the working space and give the scaffoldings construction a required configuration.

The elements of scaffoldings can be both painted, and zinced.

 


1. Main rack (1,0)
2. Main rack (0,7)
3. Top rack (1,0)
4. Top rack (0,7)
5. Deck
6. Deck with the manhole
7. Stairs
8. Crossbeam
9. Tie-handrail
10. Tie-diagonal
11. Tie-horizontal
12. Support
13. Rack for pass
14. Truss
15. Strengthened console for extension (1,0)
16. Console for extension (1,0)
17. Console for extension (0,5)
18. Transitive rack
19. Top transitive rack
20. Winch
21. Hoses for removal the waste
22. Shield grid

Parameter Unit of measurement V alue
1 Maximal height m 60;100
2 Section length along the wall m 2.0; 2.5; 3.0
3 Section width m 0.7;1.0
4 Working tier height m 2.1
6 Loading on the deck (h – up to 40 m ) kgf /m 2 no more 500
7 Loading on the deck (h – up to 60 м) kgf /m 2 no more 200
8 Loading on the deck (h – up to 100 м) kgf /m 2 no more 100